Differences between revisions 1 and 2
Revision 1 as of 2008-04-14 07:48:41
Size: 225
Editor: 216
Comment:
Revision 2 as of 2008-11-05 00:51:13
Size: 762
Editor: dsl-41-216
Comment: Initialised from http://wiki.apache.org/incubator/ReportingSchedule
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
These reports are due to the Incubator PMC by '''12 November 2008''' These reports are due here by '''12 November 2008''' so that the Incubator PMC can relay them to the board.
Line 5: Line 5:
Your project might need to report even if it is not listed below, please check your own reporting schedule or exceptions.

Please remember to include:
 * The "incubating since" info
 * The project's top 2 or 3 things to resolve prior to graduation
 * A short description of what your project's software does
Line 7: Line 13:
TODO: Use the ReportingSchedule page to initialize the list of projects in this report. = Abdera =

= BlueSky =

= Buildr =

= Click =

= CouchDB =

= Droids =

= Empire-db =

= Etch =

= Hama =

= JSecurity =

= Lokahi =

= NMaven =

= Olio =

= PDFBox =

= PhotArk =

= Sling =

= Tashi =

= VCL =

= WSRP4J =

= XAP =

November 2008 Board reports (see ReportingSchedule).

These reports are due here by 12 November 2008 so that the Incubator PMC can relay them to the board.

Your project might need to report even if it is not listed below, please check your own reporting schedule or exceptions.

Please remember to include:

  • The "incubating since" info
  • The project's top 2 or 3 things to resolve prior to graduation
  • A short description of what your project's software does


Abdera

BlueSky

Buildr

Click

CouchDB

Droids

Empire-db

Etch

Hama

JSecurity

Lokahi

NMaven

Olio

PDFBox

PhotArk

Sling

Tashi

VCL

WSRP4J

XAP

November2008 (last edited 2009-09-20 23:06:18 by localhost)