Differences between revisions 1 and 14 (spanning 13 versions)
Revision 1 as of 2008-04-28 11:20:45
Size: 129
Editor: 123
Comment:
Revision 14 as of 2008-04-29 13:12:02
Size: 2077
Editor: 123
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== '''Google Summer Of code - 2008''' ==[[BR]]
=== '''Tuscany SCA support in the Geronimo admin Console''' ===
''' Google Summer Of code - 2008 '''[[BR]]
'''Tuscany SCA support in the Geronimo admin Console'''[[BR]]
'''
Project Status '''
Line 4: Line 5:
Organisation ||Organization||Apache Software Foundation [http://apache.org]||
||Project||Apache Tuscany [http://incubator.apache.org/tuscany/]||
||Mentor||Ant Elder||
||Project Proposal||[http://wiki.apache.org/general/ThilinaBuddhika/GSoC2008/Tuscany_SCA_Support_in_the_Geronimo_Admin_Console]||
|| Contact||[thilinamb@gmail.com]||
[[BR]]

This wiki page is used to display the current status of this project. This page will be updated frequently with the current updates of the project. A separate thread in the Tuscany-dev list will be used for the regular discussions about the project.[[BR]][[BR]][[BR]]

'''Time line and the schedule of the project'''[[BR]][[BR]]
''22nd April 2008 - 29th April 2008''
– Getting Familiar with Apache Tuscany, Apache Geronimo and other related technologies [[BR]][[BR]]
''30th April 2008 – 25th May 2008''
- Coming up with the finalized list of features and a design. Defining a list of test scenarios [[BR]][[BR]]
''26th May 2008 – 5th July 2008'' – First Phase of the development [[BR]][[BR]]
''6th July 2008'' – Mid-term evaluation [[BR]][[BR]]
''15th July 2008 – 04th August 2008'' – Second Phase of development [[BR]][[BR]]
''04th August 2008 – 17th August 2008'' – Documentation, Code Reviews and testing the different scenarios defined in the designing phase[[BR]][[BR]]
''18th August 2008'' – Final Evaluation [[BR]][[BR]][[BR]]

   
'''Logs'''[[BR]][[BR]][[BR]]
''21 st April 2008'' - Got Accepted. :D [[BR]][[BR]]
''24th April 2008'' - Started going through documentation again, to grab the missing parts. [[BR]][[BR]]
''29th April 2008'' - Successfully built the Apache Tuscany again and imported it to Intellij IDEA. I used a source which was checked out early, since i found it difficult to update it. This was a bit harder as the java heap was not sufficient for maven build process. This was successful with a maximum/minimum heap of 512 MB.

Google Summer Of code - 2008 BR Tuscany SCA support in the Geronimo admin ConsoleBR Project Status

Organization

Apache Software Foundation [http://apache.org]

Project

Apache Tuscany [http://incubator.apache.org/tuscany/]

Mentor

Ant Elder

Project Proposal

[http://wiki.apache.org/general/ThilinaBuddhika/GSoC2008/Tuscany_SCA_Support_in_the_Geronimo_Admin_Console]

Contact

[thilinamb@gmail.com]

BR

This wiki page is used to display the current status of this project. This page will be updated frequently with the current updates of the project. A separate thread in the Tuscany-dev list will be used for the regular discussions about the project.BRBRBR

Time line and the schedule of the projectBRBR 22nd April 2008 - 29th April 2008 – Getting Familiar with Apache Tuscany, Apache Geronimo and other related technologies BRBR 30th April 2008 – 25th May 2008 - Coming up with the finalized list of features and a design. Defining a list of test scenarios BRBR 26th May 2008 – 5th July 2008 – First Phase of the development BRBR 6th July 2008 – Mid-term evaluation BRBR 15th July 2008 – 04th August 2008 – Second Phase of development BRBR 04th August 2008 – 17th August 2008 – Documentation, Code Reviews and testing the different scenarios defined in the designing phaseBRBR 18th August 2008 – Final Evaluation BRBRBR

LogsBRBRBR 21 st April 2008 - Got Accepted. :D BRBR 24th April 2008 - Started going through documentation again, to grab the missing parts. BRBR 29th April 2008 - Successfully built the Apache Tuscany again and imported it to Intellij IDEA. I used a source which was checked out early, since i found it difficult to update it. This was a bit harder as the java heap was not sufficient for maven build process. This was successful with a maximum/minimum heap of 512 MB.

ThilinaBuddhika/GSoC2008_status (last edited 2009-09-20 23:05:29 by localhost)