This page describes ability of test suites to execute stress tests.

  • Name hyper-references the harness location.
  • Exclude Lists are checked when per-platfrom exclude list is supported for the test suite.
  • Time to Stop is checked when a system allows to specify a VM abort timeout.
  • Time to Work is checked when a system allows to specify a time of repeated execution of the test.
  • Crash Report is checked when a test crash is correctly reflected in the report and doesn't abort test execution.
  • Numeric Report is checked when a numeric test result can be transformed into a report table. Using this report it should be easy to answer a question which of two applications under test is better.
  • x is incomplete X.
  • No labels